Boggle Hole Bridge repairs

Funding was awarded to carry out structural improvements to the bridge over the River Millbeck. The work involved reinforcing the banks of the river where storm surges have caused considerable erosion and were threatening the integrity of the Cleveland Way bridge over the Stoupe Beck. As well as reinforcing the eroded banksides, the access paths, signage and visual appearance of the area were enhanced with new path surfacing, new signposts and new fencing around the septic tanks. The project has improved water flow and minimised wash out erosion to access routes and habitats from tidal water flow.


Follow us on Social Media

  • Sirius Minerals on Twitter
  • Sirius Minerals on Facebook
  • Sirius Minerals on Youtube
  • Sirius Minerals on LinkedIn